Skema Kompetensi

Lembaga Sertifikasi Profesi ATAKNAS Profesional Konstruksi

SKEMA SERTIFIKASI OKUPASI AHLI UTAMA TEKNIK JALAN (SI031020)

Jenis Skema : Okupasi
Jenjang (Level) : 9

ROAD ENGINEERING MAJOR EXPERT OCCUPATION CERTIFICATION SCHEME (Code : SI031020)

Unit Kompetensi:

Kode Unit : F.42ATJ00.001.2
Mengendalikan Pekerjaan Survai Pendahuluan (Reconnaissance Survey)
Controlling Preliminary Survey Work (Reconnaissance Survey)

Kode Unit : F.42ATJ00.002.2
Melaksanakan Pekerjaan Pengumpulan Data
Carry out Data Collection Work

Kode Unit : F.42ATJ00.003.2
Melaksanakan Studi Kelayakan dan Lingkungan
Carry out Feasibility and Environmental Studies

Kode Unit : F.42ATJ00.004.2
Melaksanakan Pekerjaan Perencanaan Geometrik Jalan
Carry out Road Geometric Planning Work

Kode Unit : F.42ATJ00.005.2
Melaksanakan Pekerjaan Rekayasa Lalu Lintas
Carry out Traffic Engineering Work

Kode Unit : F.42ATJ00.006.2
Melaksanakan Pekerjaan Rekayasa Geoteknik
Carry out Geotechnical Engineering Work

Kode Unit : F.42ATJ00.007.2
Melaksanakan Pekerjaan Perencanaan Perkerasan Jalan
Carry out Road Pavement Planning Work

Kode Unit : F.42ATJ00.008.2
Melaksanakan Pekerjaan Perencanaan Drainase
Carry out Drainage Planning Work

Kode Unit : F.42ATJ00.009.2
Melaksanakan Pekerjaan Perencanaan Dinding Penahan Tanah dan Dinding Pelindung Lereng
Carry out Retaining Wall Planning Work and Slope Protection Wall

Kode Unit : F.42ATJ00.010.2
Melaksanakan Pekerjaan Perencanaan Bangunan Pelengkap Jalan
Carry out Road Complementary Building Planning Work

Kode Unit : F.42ATJ00.011.2
Menyiapkan Dokumen Pengadaan
Prepare Procurement Documents

Kode Unit : F.42ATJ00.012.2
Melakukan Pelaksanaan Pekerjaan Persiapan Konstruksi Jalan
Carrying out Road Construction Preparatory Work

Kode Unit : F.42ATJ00.013.2
Melaksanakan Kegiatan Administrasi Pelaksanaan Konstruksi Jalan
Carry out administrative activities for the implementation of road construction

Kode Unit : F.42ATJ00.014.2
Melaksanakan Pekerjaan Drainase
Carry out Drainage Work

Kode Unit : F.42ATJ00.015.2
Melaksanakan Pekerjaan Tanah dan Geosintetik
Carry out Earthwork and Geosynthetics

Kode Unit : F.42ATJ00.016.2
Melaksanakan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton semen
Implementing Grained Pavement and Cement Concrete Pavement

Kode Unit : F.42ATJ00.017.2
Melaksanakan Pekerjaan Perkerasan Aspal (Flexible Pavement)
Carry out Asphalt Pavement Work (Flexible Pavement)

Kode Unit : F.42ATJ00.018.2
Melakukan Pekerjaan Preventatif Pelaksanaan Pekerjaan Jalan
Doing Preventative Work for Road Work Implementation

Kode Unit : F.42ATJ00.019.2
Melaksanakan Pekerjaan Struktur Jalan
Carry out Road Structure Work

Kode Unit : F.42ATJ00.020.2
Melaksanakan Pekerjaan Harian dan Pekerjaan Lain - Lain
Carry out Daily Work and Other Jobs

Kode Unit : F.42ATJ00.021.2
Melakukan Pengawasan Kegiatan Pekerjaan Persiapan Konstruksi Jalan
Supervising Road Construction Preparatory Work Activities

Kode Unit : F.42ATJ00.022.2
Melaksanakan Pengawasan Kegiatan Administrasi Konstruksi Jalan
Carry out Supervision of Road Construction Administration Activities

Kode Unit : F.42ATJ00.023.2
Melaksanakan Pengawasan Pekerjaan Drainase
Carry out Supervision of Drainage Works

Kode Unit : F.42ATJ00.024.2
Mengawasi Pelaksanaan Pekerjaan Tanah dan Geosintetik
Supervise the Implementation of Earthworks and Geosynthetics

Kode Unit : F.42ATJ00.025.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Berbutir dan Perkerasan Beton Semen
Carry out Supervision of Grained Pavement and Cement Concrete Pavement

Kode Unit : F.42ATJ00.026.2
Melaksanakan Pengawasan Pekerjaan Perkerasan Aspal (Flexibel Pavement)
Carry out Supervision of Asphalt Pavement Works (Flexibel Pavement)

Kode Unit : F.42ATJ00.027.2
Mengawasi Pelaksanaan Pekerjaan Preventif Pekerjaan Jalan
Supervise the Implementation of Road Works Preventive Work

Kode Unit : F.42ATJ00.028.2
Melaksanakan Pengawasan Pekerjaan Struktur Jalan
Carry out Supervision of Road Structure Works

Kode Unit : F.42ATJ00.029.2
Mengawasi Pekerjaan Harian dan Pekerjaan Lain - Lain
Supervise Daily Work and Other Jobs

Biaya Uji Kompetensi

Rp. 3.500.000,-

Statistik uji kompetensi pada skema ini adalah sebagai berikut.

0

Asesi

0

Sertifikat Terbit

0

Asesor

0

Jadwal Uji Kompetensi

Persyaratan Pemohon Sertifikasi SKEMA SERTIFIKASI OKUPASI AHLI UTAMA TEKNIK JALAN

Lembaga Sertifikasi Profesi ATAKNAS Profesional Konstruksi

Adapun persyaratan pemohon uji kompetensi pada skema ini adalah sebagai berikut.

  1. Foto Copy Ijazah strata-1(S1) / strata-1 (S1) terapan / diploma-IV (D-IV) terapan program studi teknik sipil dan surat keterangan pengalaman minimal 8 (delapan) tahun dari perusahaan / atasannya, atau; Foto Copy IjazahPendidikan Profesi program studi teknik sipil dan surat keterangan pengalaman minimal 7 tahun dari perusahaan/atasannya, atau; Foto Copy Ijazah strata-2 (S2) / strata-2 (S2) Terapan / pendidikan spesialis 1 program studi teknik sipil dan surat keterangan pengalaman minimal 4 (empat) tahun dari perusahaan/atasannya, atau; Foto Copy Ijazah strata-3 (S3) / strata-3 (S3) Terapan/Pendidikan Spesialis 2 program studi teknik sipil.

  2. Kartu Tanda Anggota Asosiasi Profesi yang terdapat nomor keanggotaan asosiasi.

  3. Foto Copy Kartu Tanda Penduduk(KTP)

  4. Foto Copy NPWP

  5. Pas Foto Berwarna 3x4

  6. Surat Keterangan Pengalaman Dibidang Teknik Jalan